MIP 3.1 & 3.2: As-Planned vs As-Built

In this video, I explain the following delay analysis methods in accordance with the AACEI RP 29R-03:

MIP 3.1: As-Planned vs. As-Built, Observational, Single Base, Static, Gross

MIP 3.2: As-Planned vs. As-Built, Observational, Multiple base, Static, Periodic.

➡️ What will you learn?

✅ The Source Validation Protocols (SVPs) and the guidelines of both methods.

✅ How to perform the analysis STEP-BY-STEP.

✅ The advantages, disadvantages, uses and limitations of these methods.